§ 98-93. Responsibilities of the person discharging waste.  


Latest version.
  • It shall be the responsibility of the person discharging industrial waste into the city sewerage system to:

    (1)

    Build a control structure in the discharge line from his premises, immediately prior to the entrance of the discharge line into the city sewerage system, suitable for the sampling and measuring of wastes. Plans for this structure must be approved by the city. This requirement may be waived if deemed unnecessary by the city. If no special manhole is required, the control manhole shall be considered to be the nearest downstream manhole in the public sewer to the point at which the building sewer is connected.

    (2)

    Contact the city prior to operation changes which will materially alter the characteristics of the waste from the last prior sampling.

    (3)

    Make timely, periodic payments to the city of surcharges for excessive loadings as detailed in the city user charge system.

(Ord. No. 2008-0005, 5-12-2008)